News - Details

Be aware of bridge painting at Meadowbrook Park

Urbana Park District will be painting the three metal bridges along the paved path system at Meadowbrook Park.

"These bridges need a fresh coat of paint," said Andy Rousseau, Project Manager, Urbana Park District.

"We'll have a detour around the bridge at the Prairie Play area. The other two bridges will be open during the painting, so people can walk the entire path system."

Be sure to follow the signs and avoid any potential wet paint during this project.

full_bloom

Back to news